Ref. No. | Date | Supplier | Description | Amount |
B-19-2019 | 06/27/2019 | MOLROW CONSTRUCTION & SUPPLY | To hire contractor to provide materials, labor and equipment for three (3) Infrastructure Projects, viz: 1 Additional Appropriation for the Construction of Wave Breaker, Brgy. Bonawon, Siaton, Negros Oriental P3,920,000.00 2 Construction of Wave Breaker, Brgy. Bonawon, Siaton, Negros Oriental P3,920,000.00 3 Construction of Protection Dike/River Control Along Bonawon River, Siaton, Negros Oriental P3,911,062.40 |
P11,722,395.86
|
Posted: July 11, 2019 |