Ref. No. | Date | Supplier | Description | Amount |
B-362-2019 | 05/08/2020 | MOLROW CONSTRUCTION & SUPPLY | To hire contractor to provide materials, labor and equipment for three (3) Infrastructure Projects, viz: 1 Concreting of Road Brgy. Banga, Bayawan City, Neg. Or. P784,000.00 2 Additional Appropriation for the Const. of Flood Control Dike, Brgy. Ubos, Bayawan Ciy, Neg. Or. P2,940,000.00 3 Const.of Box Culvert, Brgy. Maglinao, Basay, Neg. Or. P1,960,000.0 |
P5,670,486.31 |