Ref. No. Date Supplier Description Amount
B-71-2020 08/16/2020 ADRIAN TRADING   Four (4) Lots Construction Materials for use in the Construction of River Control Connecting the Existing Footbridge of So. Maglinte & So. Bangculutan, Brgy. Mayabon, Zamboanguita, Neg. Or.

LCRB for Lot # 1 only.

P488,362.00