SUPPLEMENTAL/BID BULLETIN
Addendum No. 2
This Bid Bulletin is issued to inform prospective bidders of some changes and/or modifications introduced for the requirements in the procurement of One (1) Lot, 15 Infrastructure Projects under Bid No. B-156-2024, ABC:P444,000,000.00, viz:
Amendments in the ABC of item 3, Page 4 & Page 26:
Change from: |
Change to: |
3. To hire contractor to provide materials , labor, and equipment: “Installation of Solar Streetlights in Bacong, Negros Oriental.” which includes the following scope of work:
Item No. |
Item of work |
Quantity |
Unit |
A.1.1(15) |
Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building |
1.00 |
Lot |
B.5 |
Signages |
1.00 |
Lot |
B.9 |
Mobilization/Demobilization |
1.00 |
Lot |
B.7 |
Safety & Health Program |
1.00 |
Lot |
803(1) |
Structure Excavation |
252.00 |
Cu.m. |
902(1)a |
Reinforcing Steel (Deformed), Grade-40 |
6,915.00 |
Kgs. |
900(1)c1 |
Structural Concrete, Class A |
142.00 |
Cu.m. |
SPCL |
Hauling |
1.00 |
Lot |
1103(1) |
Lighting Fixtures and Lamps |
1.00 |
Lot |
1032(1)C |
Painting Works (Steel) |
127.00 |
Sq.m. |
B24 |
General Scaffolding & Shoring |
248.73 |
Sq.m. |
|
Contract Duration: 36 Calendar Days |
|
|
ABC:P39,600,000.00
|
3. To hire contractor to provide materials , labor, and equipment: “Installation of Solar Streetlights in Bacong, Negros Oriental.” which includes the following scope of work:
Item No. |
Item of work |
Quantity |
Unit |
A.1.1(15) |
Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building |
1.00 |
Lot |
B.5 |
Signages |
1.00 |
Lot |
B.9 |
Mobilization/Demobilization |
1.00 |
Lot |
B.7 |
Safety & Health Program |
1.00 |
Lot |
803(1) |
Structure Excavation |
252.00 |
Cu.m. |
902(1)a |
Reinforcing Steel (Deformed), Grade-40 |
6,915.00 |
Kgs. |
900(1)c1 |
Structural Concrete, Class A |
142.00 |
Cu.m. |
SPCL |
Hauling |
1.00 |
Lot |
1103(1) |
Lighting Fixtures and Lamps |
1.00 |
Lot |
1032(1)C |
Painting Works (Steel) |
127.00 |
Sq.m. |
B24 |
General Scaffolding & Shoring |
248.73 |
Sq.m. |
|
Contract Duration: 36 Calendar Days |
|
|
ABC:P29,600,000.00 |
Bidders are enjoined to take note and consider the above mentioned amendments in the ABC of item 3 in the preparation of their bids.
For the information and guidance of all concerned.
Issued this 29th day of April, 2024.